The cheapest time to plan office access control is before the ceilings close. During a fit-out, cables, back boxes and lock preparation cost a fraction of what they cost to retrofit into finished partitions and glass. This checklist is for office managers, fit-out contractors and ELV teams planning access control for a new office in Dubai, from choosing the doors to handover.
Step 1: Decide which doors need control
List every door and decide what each one needs. A typical office looks like this:
| Door | Typical reader | Typical lock |
|---|---|---|
| Main entrance | Face recognition terminal (access and attendance) | Magnetic lock or electric bolt for glass doors |
| Server or comms room | Card plus fingerprint or face (two factors) | Electric strike or magnetic lock |
| Finance, HR and management | Card or fingerprint reader | Electric strike or magnetic lock |
| Stores and archives | Card reader | Electric strike |
| Meeting rooms and pantry | Usually free access | Standard lock |
Step 2: Choose the reader for each door
At the main entrance, a face recognition terminal such as the SpeedFace V5L-P opens the door and records attendance in one step, which avoids a separate time clock. Internal doors usually take card readers such as the KR500 or KR600, or fingerprint readers where cards would be shared. A single door in a small office can run on a standalone terminal such as the F18 or X6.
Step 3: Plan controllers and software
With more than two doors, readers connect to a controller in a secure location such as the comms room. The C3-200 and InBio 260 control two doors each, and four-door models suit larger floors. In multi-floor towers, the EC10 controls which floors a card or face can reach in the lift.
Choose the software at the same time: BioTime for attendance and payroll, ZKBio CVSecurity for central access control. Our BioTime vs ZKBio CVSecurity guide explains the difference.
Step 4: First-fix checklist for the fit-out contractor
- Cable routes from each door to the controller location, with containment above the ceiling.
- Back boxes at the agreed reader height beside each door, and for exit buttons on the inside.
- Power at the controller and power supply location, ideally on a protected circuit.
- Network points at the main entrance terminal and at each controller.
- Door contacts on controlled doors, so held-open and forced doors are reported.
- Glass door hardware: brackets or bolt preparation for frameless glass, agreed with the glazing contractor.
- Fire alarm interface: a signal from the fire alarm panel so escape-route doors release.
Step 5: Approvals and life safety
Ask building management for their access control rules and any approved contractor list early. Some security installations in Dubai need approval from the Security Industry Regulatory Agency (SIRA), depending on the system and the building, so check what applies before work starts. Doors on escape routes must release when the fire alarm sounds; agree the interface with your fire consultant.
Step 6: Handover and support
Before the team moves in, enrol staff faces, fingerprints or cards, set the door schedules and departments, and train the office administrator to add and remove users. Test every door, including the exit button, power failure and fire alarm release. An annual maintenance contract keeps the system working after the defects period.