Buyer guide

Office Access Control in Dubai: A Fit-Out Checklist for New Offices

Planning access control for a new office in Dubai? A fit-out checklist: doors, readers, locks, cabling, fire alarm, attendance, approvals and handover.

ZKTeco face recognition terminal, card reader and door controller for an office fit-out in Dubai
On this page 8 sections
  1. Step 1: Decide which doors need control
  2. Step 2: Choose the reader for each door
  3. Step 3: Plan controllers and software
  4. Step 4: First-fix checklist for the fit-out contractor
  5. Step 5: Approvals and life safety
  6. Step 6: Handover and support
  7. Get a fit-out quotation
  8. Frequently asked questions

The cheapest time to plan office access control is before the ceilings close. During a fit-out, cables, back boxes and lock preparation cost a fraction of what they cost to retrofit into finished partitions and glass. This checklist is for office managers, fit-out contractors and ELV teams planning access control for a new office in Dubai, from choosing the doors to handover.

Step 1: Decide which doors need control

List every door and decide what each one needs. A typical office looks like this:

Typical office doors and their access control
DoorTypical readerTypical lock
Main entranceFace recognition terminal (access and attendance)Magnetic lock or electric bolt for glass doors
Server or comms roomCard plus fingerprint or face (two factors)Electric strike or magnetic lock
Finance, HR and managementCard or fingerprint readerElectric strike or magnetic lock
Stores and archivesCard readerElectric strike
Meeting rooms and pantryUsually free accessStandard lock

Step 2: Choose the reader for each door

At the main entrance, a face recognition terminal such as the SpeedFace V5L-P opens the door and records attendance in one step, which avoids a separate time clock. Internal doors usually take card readers such as the KR500 or KR600, or fingerprint readers where cards would be shared. A single door in a small office can run on a standalone terminal such as the F18 or X6.

Step 3: Plan controllers and software

With more than two doors, readers connect to a controller in a secure location such as the comms room. The C3-200 and InBio 260 control two doors each, and four-door models suit larger floors. In multi-floor towers, the EC10 controls which floors a card or face can reach in the lift.

Choose the software at the same time: BioTime for attendance and payroll, ZKBio CVSecurity for central access control. Our BioTime vs ZKBio CVSecurity guide explains the difference.

Step 4: First-fix checklist for the fit-out contractor

  • Cable routes from each door to the controller location, with containment above the ceiling.
  • Back boxes at the agreed reader height beside each door, and for exit buttons on the inside.
  • Power at the controller and power supply location, ideally on a protected circuit.
  • Network points at the main entrance terminal and at each controller.
  • Door contacts on controlled doors, so held-open and forced doors are reported.
  • Glass door hardware: brackets or bolt preparation for frameless glass, agreed with the glazing contractor.
  • Fire alarm interface: a signal from the fire alarm panel so escape-route doors release.

Step 5: Approvals and life safety

Ask building management for their access control rules and any approved contractor list early. Some security installations in Dubai need approval from the Security Industry Regulatory Agency (SIRA), depending on the system and the building, so check what applies before work starts. Doors on escape routes must release when the fire alarm sounds; agree the interface with your fire consultant.

Step 6: Handover and support

Before the team moves in, enrol staff faces, fingerprints or cards, set the door schedules and departments, and train the office administrator to add and remove users. Test every door, including the exit button, power failure and fire alarm release. An annual maintenance contract keeps the system working after the defects period.

Get a fit-out quotation

Send us the floor plan or door schedule, the number of staff and the fit-out programme. We supply ZKTeco equipment for contractors, or supply and install it ourselves, anywhere in the UAE. Contractors can see how we work with fit-out and ELV teams on our contractor supply page.

Frequently asked questions

When should access control be planned in an office fit-out?

At design stage, before ceilings and partitions close. Cables, back boxes and lock preparation are far easier to install during first fix than to retrofit later.

Can the same device handle access control and attendance?

Yes. A face recognition terminal at the main entrance can open the door and record attendance in one step, with reports in BioTime.

Which lock suits a frameless glass office door?

Glass doors usually need a magnetic lock with a glass-door bracket or an electric bolt. We confirm the lock for each door during the survey, together with the glazing contractor.

Do I need building management approval for access control?

Usually yes. Ask building management for their rules early, and check whether SIRA approval applies to your system and building.

Can you work with our fit-out contractor?

Yes. We can supply equipment and datasheets to your contractor, or supply and install the system ourselves and coordinate with the fit-out programme.
Share this guide

More ZKTeco guides

All guides

Talk to a ZKTeco specialist in Dubai

Tell us about your site and we will recommend the right devices and software.

Chat Now